The Approach
One point of contact
You deal with the surveyor responsible for your project, start to finish. On larger developments we coordinate the wider team and you still have one point of contact
A network behind us
Where a matter sits outside our field, we draw on trusted planners, engineers and consultants to put the right person in front of you
Clear from the start
Written fee proposals, realistic timeframes and honest advice, including being frank if a project isn't going to stack up
The Process
Every job runs through the same clear stages. Smaller jobs stop after the survey phase. Subdivisions carry through to new titles
Phase 1: Getting started
Initial discussion
A call or site visit to understand what you want to achieve, and whether it stacks up
Fee proposal
A written scope and fee, so you know exactly what you are paying for before work begins
Phase 2: Survey
Research and boundary calculation
Searching the survey records and titles, and calculating where your boundaries truly lie
Fieldwork
Measuring features and marking boundaries using survey-grade GNSS and total station equipment
Data processing
Reducing the field measurements into precise survey data for issue
Plans and reports
Topographic, set-out, scheme, or boundary marking plan, prepared for you, your designer and council as the job requires
Phase 3: Consents and approvals
Resource consent
Preparing and lodging the subdivision application with council
Consent conditions
Working through the conditions council attaches to its approval
Detailed design
Roading, water, wastewater and stormwater design to satisfy consent conditions
Engineering approval
Council sign-off on the engineering design before construction starts
(Subdivision projects)
Phase 4: Construction and titles
(Subdivision projects)
Construction
Civil works built to the approved design, with set-out and as-built surveys along the way
New boundaries
Placing the new boundary marks and preparing the title plan and record of survey for LINZ
Council certification
Section 223 approval of the title plan, and section 224(c) certification that the conditions of consent have been met
New titles
The title plan and record of survey is submitted to LINZ together with your solicitor's documents, the survey is deposited and your new titles are issued